Buildeey
Al Nubla General Contracting Co. LLC

Al Nubla General Contracting Co. L.L.C. - Abu Dhab...

  • حول

We are satisfied to have this chance to acquaint you with NCC and its history in the United Arab Emirates.

The organization was set up in Abu Dhabi in 1995 with a concentration when all is said in done contracting work. In 2008, we built up a branch in Dubai 2008. NCC is an ISO confirmed organization with ISO 9001, ISO 14001 and OHSAS 18001certificates.

In mid 1997 we propelled our burrowing division utilizing the best in class smaller scale burrowing innovation and pipe jacking technique. Since that time we have effectively developed and in excess of 80 KM of pipe lines of fluctuating distances across by the non-troublesome strategy utilizing the ISEKI TCC 600, ISEKI TCC 800, HERRENKNECHT AVN 600, AVN 800B, AVN 800A, AVN 1000, AVN 1200, AVN 1400, AVN 1600, AVN 1800 and AVN 2500 small scale burrowing machines in various ground conditions, with and without ground water tables at various soil strata.

Pipe lines developed by the non-problematic strategy were basically in the Emirate of Abu Dhabi for such customers as Abu Dhabi Municipality, Abu Dhabi Sewerage Services Company (ADSSC), the open works and ADWEA and TRANSCO (ADDC). We have additionally completed burrowing works in Dubai for Dubai Municipality and M/s. DEWA, just as in Sharjah and Ajman for the nearby regions.

The development of pipe lines using the non-troublesome strategy has been done by utilizing smaller scale burrowing advancements in two different ways: (a) by encasing the bearer pipe which much of the time GRP/GRE with a fortified cement and jack it legitimately to the right line and level or (b) by jacking a steel or RC pipe as a sleeve, introducing the transporter pipe in side it and grouting the annulus space by a non-recoil grout or a froth concrete.

We have built in excess of 900 lines with lengths shifting from 35meters to 300 meters using the non-troublesome strategy. As a major aspect of our proceeded with development and advancement, we have as of late prepared the organization to complete lengthy drives of up to 600 meters for pipe breadths of 1200mm and above, and an inside width of up to 3 meters. The built pipelines were identified with 77 extends in the U.A.E. for sewerage, Irrigation and water pipe lines.

We have effectively jacked in excess of 80 Km of pipe lines, going from 500mm to 2400mm in inner distance across, crossing under existing street (sub principle and fundamental streets), existing administrations, existing gas and fuel lines and under lakes. We have further effectively jacked funnels with a spread going from 2 meter to 22 meters in shifting soil conditions.

The organization presently possesses 17 burrowing machines esteemed at more than 40 million dirhams. Our machines are sourced from driving producers of burrowing machines to guarantee we stay at the front line of the burrowing industry. Two (2) of our machines are fabricated by ISEKI-Japan and thirteen (15) are produced by Herrenknecht – Germany. The machines are of changing distances across and can jack funnels from 500mm ID to 3000mm ID channels.

While our responsibility to the advances in innovation put us at the front line of the burrowing industry, we recognize this would not be conceivable without our staff. We invest heavily in our master staff and exceedingly prepared and experienced administrators and their responsibility to the organization and to our esteemed customers. We have and keep on putting resources into our staff by creating continuous preparing programs since we immovably trust that the long haul achievement and supportability of a business is straightforwardly connected to its administration and staff.

Services offered:

  • Microtunneling
  • Construction
تحقق عن خدمات أخرى في الإمارات العربية المتحدة